Cost to Charge a 2024 Rivian R1S
Charging a 2024 Rivian R1S from 10% to 80% at home costs about $17.30 at the U.S. average electricity rate (16.5¢/kWh). A full 135 kWh charge is roughly $24.72, or about $7.02 per 100 miles. Use the calculator below for your own rate.
Full charge (home)
$24.72
135 kWh @ 16.5¢/kWh
Per 100 miles
$7.02
352 mi EPA range
10–80% top-up
$17.30
Most common charge
Charging cost by electricity rate
What it costs to charge the Rivian R1S at three representative U.S. rates.
| Charge window | Washington11.9¢/kWh | U.S. average16.5¢/kWh | California32.0¢/kWh |
|---|---|---|---|
| 10% → 80% (typical top-up) | $12.50 | $17.30 | $33.57 |
| 20% → 80% (fast-charge stop) | $10.71 | $14.83 | $28.77 |
| 0% → 100% (full charge) | $17.85 | $24.72 | $47.96 |
Calculate your exact cost
Battery is pre-filled to the Rivian R1S's 135 kWh. Enter your own electricity rate.
Loading calculator…
Frequently asked questions
At the U.S. average residential rate of 16.5¢/kWh, a full 0–100% charge of the 2024 Rivian R1S's 135 kWh battery costs about $24.72. A typical 10–80% top-up is roughly $17.30. Your cost depends on your local electricity rate — enter it above.
Compare other EVs
How long does it take to charge?
Cost is one half of the picture. See charge times for the Rivian R1S on Level 1, Level 2, and DC fast charging.
Rivian R1S charging time